Follow
Hossein Mirzaei Nasirabad
Hossein Mirzaei Nasirabad
Department of Mining Engineering, Sahand University of Technology, Tabriz, Iran
Verified email at sut.ac.ir
Title
Cited by
Cited by
Year
Optimal determination of rheological parameters for herschel-bulkley drilling fluids using genetic algorithms (GAs)
R Rooki, FD Ardejani, A Moradzadeh, H Mirzaei, V Kelessidis, ...
Korea-Australia rheology journal 24, 163-170, 2012
512012
Improving the performance of intelligent back analysis for tunneling using optimized fuzzy systems: case study of the Karaj Subway Line 2 in Iran
H Khamesi, SR Torabi, H Mirzaei-Nasirabad, Z Ghadiri
Journal of computing in civil engineering 29 (6), 05014010, 2015
382015
Optimization of truck-shovel allocation in open-pit mines under uncertainty: a chance-constrained goal programming approach
M Mohtasham, H Mirzaei-Nasirabad, B Alizadeh
Mining Technology 130 (2), 81-100, 2021
252021
Consolidation grouting quality assessment using artificial neural network (ANN)
J Zadhesh, F Rastegar, F Sharifi, H Amini, HM Nasirabad
Indian Geotechnical Journal 45, 136-144, 2015
242015
A multi-objective model for fleet allocation schedule in open-pit mines considering the impact of prioritising objectives on transportation system performance
M Mohtasham, H Mirzaei-Nasirabad, H Askari-Nasab, B Alizadeh
International Journal of Mining, Reclamation and Environment 35 (10), 709-727, 2021
222021
Development of 2D computer program to determine geometry of rock mass blocks
R Yarahmadi, R Bagherpour, R Kakaie, NH Mirzaie, M Yari
International Journal of Mining Science and Technology 24 (2), 191-194, 2014
182014
Truck fleet size selection in open-pit mines based on the match factor using a MINLP model
M Mohtasham, H Mirzaei-Nasirabad, H Askari-Nasab, B Alizadeh
Mining Technology 130 (3), 159-175, 2021
152021
Multi-stage optimization framework for the real-time truck decision problem in open-pit mines: a case study on Sungun copper mine
M Mohtasham, H Mirzaei-Nasirabad, H Askari-Nasab, B Alizadeh
International Journal of Mining, Reclamation and Environment 36 (7), 461-491, 2022
142022
Application of ANN-PSO algorithm based on FDM numerical modelling for back analysis of EPB TBM tunneling parameters
L Nikakhtar, S Zare, HM Nasirabad, B Ferdosi
European Journal of Environmental and Civil Engineering 26 (8), 3169-3186, 2022
132022
Numerical modelling of backfill grouting approaches in EPB tunneling
L Nikakhtar, S Zare, H Mirzaei Nasir Abad
Journal of mining and environment 11 (1), 301-314, 2020
132020
Development of a goal programming model for optimization of truck allocation in open pit mines
MMA Mohtasham M, Mirzaei Nasirabad H
Journal of Mining and Environment 8 (3), 359-371, 2017
132017
Artificial neural network to predict the health risk caused by whole body vibration of mining trucks
MJ Rahimdel, M Mirzaei, J Sattarvand, B Ghodrati, H Mirzaei Nasirabad
Journal of Theoretical and Applied Vibration and Acoustics 3 (1), 1-14, 2017
102017
An optimization model for the real-time truck dispatching problem in open-pit mining operations
H Mirzaei-Nasirabad, M Mohtasham, H Askari-Nasab, B Alizadeh
Optimization and Engineering 24 (4), 2449-2473, 2023
72023
Comparison of the various dispatching strategies for truck-shovel productivity optimization in open pit mines
H Mirzaei-Nasirabad, M Mohtasham, M Omidbad
International Journal of Mining and Geo-Engineering 53 (2), 193-202, 2019
62019
Developing a MatLab code for determine geometry of rock mass blocks and its applications in mining and rock mechanic engineering
R Yarahmadi, R Bagherpour, A Khademian, H Mirzaie, R Kakaie
Journal of Mining and Metallurgy A: Mining 51 (1), 41-49, 2015
62015
Numerical study of face pressure effect on surface settlement in soft ground mechanized tunneling-a case study: tehran metro line 7
SR HEIDARI, S Zare, NH MIRZAEI, M Foroughi
TUNNELING & UNDERGROUND SPACE ENGINEERING 1 (1), 100-100, 2013
62013
Experimental investigation of crack propagation and coalescence in rock-like materials under uniaxial compression
H Mirzaei, R Kakaie, SME Jalali, M Shariati, B Hassani
ISRM EUROCK, ISRM-EUROCK-2010-054, 2010
42010
Evaluating the efficiency of the genetic algorithm in designing the ultimate pit limit of open-pit mines
N Azadi, H Mirzaei-Nasirabad, A Mousavi
International Journal of Mining and Geo-Engineering 57 (1), 55-58, 2023
32023
Evaluating the effect of fleet management on the performance of mining operations using integer linear programming approach and two different strategies
H Mirzaei Nasirabad, M Mohtasham, F Rahimzadeh-Nanekaran
Interdisciplinary Journal of Management Studies (Formerly known as Iranian …, 2023
32023
Intelligent identification of soil and operation parameters in mechanised tunnelling by a hybrid model of artificial neural network-genetic algorithm (case study: Tabriz Metro …
L Nikakhtar, S Zare, H Mirzaei Nasirabad
Civil Engineering and Environmental Systems 39 (4), 287-308, 2022
32022
The system can't perform the operation now. Try again later.
Articles 1–20