Askiner Gungor
Title
Cited by
Cited by
Year
Issues in environmentally conscious manufacturing and product recovery: a survey
A Gungor, SM Gupta
Computers & Industrial Engineering 36 (4), 811-853, 1999
15271999
Disassembly line in product recovery
A Güngör, SM Gupta
International Journal of Production Research 40 (11), 2569-2589, 2002
2992002
Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships
KE Moore, A Güngör, SM Gupta
European Journal of Operational Research 135 (2), 428-449, 2001
2442001
A solution approach to the disassembly line balancing problem in the presence of task failures
A Gungor, SM Gupta
International journal of production research 39 (7), 1427-1467, 2001
2252001
Disassembly sequence planning for products with defective parts in product recovery
A Gungor, SM Gupta
Computers & Industrial Engineering 35 (1-2), 161-164, 1998
2111998
An evaluation methodology for disassembly processes
A Gungor, SM Gupta
Computers & Industrial Engineering 33 (1-2), 329-332, 1997
1991997
Disassembly sequence plan generation using a branch-and-bound algorithm
A GÜngÖr, SM Gupta
International Journal of Production Research 39 (3), 481-509, 2001
1602001
A Petri net approach to disassembly process planning
KE Moore, A Gungor, SM Gupta
Computers & Industrial Engineering 35 (1-2), 165-168, 1998
1451998
Evaluation of connection types in design for disassembly (DFD) using analytic network process
A Güngör
Computers & Industrial Engineering 50 (1-2), 35-54, 2006
1442006
Disassembly Line: Balancing and Modeling
S McGovern, S Gupta
McGraw-Hill Education, 2011
1262011
Disassembly line balancing problem: a review of the state of the art and future directions
E Özceylan, CB Kalayci, A Güngör, SM Gupta
International Journal of Production Research 57 (15-16), 4805-4827, 2019
1152019
A model proposal for green supply chain network design based on consumer segmentation
S Coskun, L Ozgur, O Polat, A Gungor
Journal of Cleaner Production 110, 149-157, 2016
1132016
Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm
CB Kalayci, A Hancilar, A Gungor, SM Gupta
Journal of Manufacturing Systems 37, 672-682, 2015
1092015
Disassembly line balancing
A Gungor, SM Gupta
Omnipress, 1999
941999
Mixed model disassembly line balancing problem with fuzzy goals
T Paksoy, A Güngör, E Özceylan, A Hancilar
International Journal of Production Research 51 (20), 6082-6096, 2013
742013
Disassembly process planning using Petri nets
KE Pbioore, A Gungor, SM Gupta
Proceedings of the 1998 IEEE International Symposium on Electronics and the …, 1998
611998
Disassembly sequence planning for complete disassembly in product recovery
A Gungor, SM Gupta
Omnipress, 1998
481998
Disassembly Petri net generation in the presence of XOR precedence relationships
KE Moore, A Gungor, SM Gupta
SMC'98 Conference Proceedings. 1998 IEEE International Conference on Systems …, 1998
411998
A systematic solution approach to the disassembly line balancing problem
A Gungor, SM Gupta
Proceedings of the 25th International Conference on Computers and Industrial …, 1999
331999
Complications in disassembly line balancing
A Gungor, SM Gupta, K Pochampally, SV Kamarthi
Environmentally conscious manufacturing 4193, 289-298, 2001
312001
The system can't perform the operation now. Try again later.
Articles 1–20