Follow
Arezoo Atighehchian
Title
Cited by
Cited by
Year
A novel hybrid algorithm for scheduling steel-making continuous casting production
A Atighehchian, M Bijari, H Tarkesh
Computers & Operations Research 36 (8), 2450-2461, 2009
1782009
Facility layout design using virtual multi-agent system
H Tarkesh, A Atighehchian, AS Nookabadi
Journal of Intelligent Manufacturing 20, 347-357, 2009
592009
Operating room scheduling in teaching hospitals
S Ghazalbash, MM Sepehri, P Shadpour, A Atighehchian
Advances in Operations Research 2012, 2012
572012
Design of mathematical models for the integration of purchase and production lot-sizing and scheduling problems under demand uncertainty
M Mohammadi, M Esmaelian, A Atighehchian
Applied Mathematical Modelling 84, 1-18, 2020
252020
A two-step stochastic approach for operating rooms scheduling in multi-resource environment
A Atighehchian, MM Sepehri, P Shadpour, K Kianfar
Annals of Operations Research 292, 191-214, 2020
172020
Using mixed integer programming and constraint programming for operating rooms scheduling with modified block strategy
M Younespour, A Atighehchian, K Kianfar, ET Esfahani
Operations Research for Health Care 23, 100220, 2019
162019
A PROFIT-MAXIMIZING MODEL FOR INTEGRATED LOT-SIZING AND SCHEDULING PROBLEM WITH MULTI-ITEM SUPPLIER SELECTION AND DEMAND PACKAGES.
M Mohammadi, M Esmaelian, A Atighehchian
International Journal of Industrial Engineering 27 (3), 2020
82020
Daily operating rooms scheduling under uncertainty using Simulation based optimization approach
M Imani Imanlu, A Atighehchian
Journal of Industrial Management Perspective 7 (2, Summer 2017), 53-82, 2017
82017
An environment-driven, function-based approach to dynamic single-machine scheduling
A Atighehchian, MM Sepehri
European Journal of Industrial Engineering 7 (1), 100-118, 2013
82013
Project management using self-organizing maps
J Parvizian, H Tarkesh, S Farid, A Atighehchian
Industrial Engineering and Management Systems, the official journal of …, 2006
62006
Operating room scheduling in teaching hospitals: a novel stochastic optimization model
A Atighehchian, MM Sepehri, P Shadpour
INTERNATIONAL JOURNAL HOSPITAL RESEARCH 4 (4), 171-176, 2015
42015
A hybrid heuristic approach to master surgery scheduling with downstream resource constraints and dividable operating room blocks
K Kianfar, A Atighehchian
Annals of Operations Research 328 (1), 727-754, 2023
32023
Identifying and Evaluating the Entrepreneurship and Innovation Indicators of Smart International Companies Using DEMATEL-ANP
M Karimi, F Namamian, F Vafaei, A Moradi
Journal of Industrial Management Perspective 10 (4, Winter 2021), 117-154, 2020
32020
Determining the optimal surgical case-mix and capacity assignment for surgical services in hospitals using simulated annealing
AS Ajadi, S Ketabi, A Atighehchian
Industrial Management Journal 10 (4), 631-650, 2018
32018
Hospital bed capacity management during the COVID-19 outbreak using system dynamics: A case study in Amol public hospitals, Iran
S Hosseinzadeh, S Ketabi, A Atighehchian, R Nazari
International Journal of Healthcare Management 17 (1), 63-75, 2024
22024
STEELMAKING-CONTINUOUS CASTING SCHEDULING USING A HYBRID META-HEURISTIC CASE STUDY: KHOOZESTAN STEEL COMPLEX
A Atighehchian
PRODUCTION AND OPERATIONS MANAGEMENT 7 (112), 137-153, 2016
22016
Optimizing a multi-objective master surgical scheduling under probabilistic length of stay and demand uncertainty
M Ebrahimi, A Atighehchian, M Esmaelian
Scientia Iranica, 2023
12023
Design of a mathematical model and a simulation-optimisation approach for master surgical scheduling considering uncertainty in length of stay, demands and duration of surgery
M Ebrahimi, A Atighehchian
International Journal of Industrial and Systems Engineering 43 (4), 435-463, 2023
12023
Robust operating room planning through a novel modified block scheduling strategy
M Norouzi, A Atighehchian, S Ketabi
International Journal of Operational Research 43 (4), 479-497, 2022
12022
A TWO-STAGE ROBUST METHOD FOR FLEXIBLE INTEGRATED MASTER SURGICAL SCHEDULING AND CASE-MIX PLANNING.
S Barafkandeh, A Atighehchian, K Kianfar
International Journal of Industrial Engineering 29 (1), 2022
12022
The system can't perform the operation now. Try again later.
Articles 1–20