Follow
Ronald Askin
Ronald Askin
Professor of Industrial Engineering, Arizona State University
Verified email at asu.edu
Title
Cited by
Cited by
Year
Modeling and analysis of manufacturing systems
RG Askin, CR Standridge
(No Title), 1993
12811993
Cell formation in group technology: review, evaluation and directions for future research
HM Selim, RG Askin, AJ Vakharia
Computers & Industrial Engineering 34 (1), 3-20, 1998
5991998
Design and analysis of lean production systems
RG Askin, JB Goldberg
John Wiley & Sons, 2007
4302007
A cost-based heuristic for group technology configuration
RG ASKTN, SP Subramantan
International Journal of Production Research 25 (1), 101-113, 1987
3491987
Scheduling flexible flow lines with sequence-dependent setup times
ME Kurz, RG Askin
European Journal of Operational Research 159 (1), 66-82, 2004
3312004
Forming effective worker teams with multi-functional skill requirements
EL Fitzpatrick, RG Askin
Computers & industrial engineering 48 (3), 593-608, 2005
2342005
Comparing scheduling rules for flexible flow lines
ME Kurz, RG Askin
International Journal of Production Economics 85 (3), 371-388, 2003
2022003
A graph partitioning procedure for machine assignment and cell formation in group technology
RG Askin, KS Chiu
The International Journal of Production Research 28 (8), 1555-1572, 1990
1961990
A Hamiltonian path approach to reordering the part-machine matrix for cellular manufacturing
RG Askin, SH Cresswell, JB Goldberg, AJ Vakharia
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 29 (6), 1081-1100, 1991
1931991
Project selection, scheduling and resource allocation with time dependent returns
J Chen, RG Askin
European Journal of Operational Research 193 (1), 23-34, 2009
1852009
A parallel station heuristic for the mixed-model production line balancing problem
RG Askin, M Zhou
International Journal of Production Research 35 (11), 3095-3106, 1997
1701997
Reliability analysis of electronic devices with multiple competing failure modes involving performance aging degradation
W Huang, RG Askin
Quality and Reliability Engineering International 19 (3), 241-254, 2003
1682003
A methodology for designing flexible cellular manufacturing systems
RG Askin, HM Selim, AJ Vakharia
IIE transactions 29 (7), 599-610, 1997
1421997
Heuristic scheduling of parallel machines with sequence-dependent set-up times
ME Kurz, RG Askin
International journal of production research 39 (16), 3747-3769, 2001
1382001
Forming effective worker teams for cellular manufacturing
RG Askin, Y Huang
International Journal of Production Research 39 (11), 2431-2451, 2001
1292001
A procedure for production lot sizing with probabilistic dynamic demand
RG Askin
Aiie Transactions 13 (2), 132-137, 1981
1161981
Optimal new product design using quality function deployment with empirical value functions
D Dawson, RG Askin
Quality and Reliability Engineering International 15 (1), 17-32, 1999
1131999
Formation of independent flow-line cells based on operation requirements and machine capabilities
RG Askin, M Zhou
IIE transactions 30 (4), 319-329, 1998
1061998
A generalized SSI reliability model considering stochastic loading and strength aging degradation
W Huang, RG Askin
IEEE Transactions on Reliability 53 (1), 77-82, 2004
1022004
Determining the number of kanbans in multi-item just-in-time systems
RG Askin, M George Mitwasi, JB Goldberg
IIE transactions 25 (1), 89-98, 1993
971993
The system can't perform the operation now. Try again later.
Articles 1–20