Follow
Saman Cyrus
Title
Cited by
Cited by
Year
A robust accelerated optimization algorithm for strongly convex functions
S Cyrus, B Hu, B Van Scoy, L Lessard
2018 Annual American Control Conference (ACC), 1376-1381, 2018
852018
A timeseries supervised learning framework for fault prediction in chiller systems
Z Jiang, MJ Risbeck, SCK Samy, C Zhang, S Cyrus, YM Lee
Energy and Buildings 285, 112876, 2023
62023
Unified necessary and sufficient conditions for the robust stability of interconnected sector-bounded systems
S Cyrus, L Lessard
2019 IEEE 58th Conference on Decision and Control (CDC), 7690-7695, 2019
32019
Design optimization and closed-loop operational planning to achieve sustainability goals in buildings
MJ Risbeck, S Cyrus, C Zhang, YM Lee
Computers & Chemical Engineering 181, 108519, 2024
12024
Generalized necessary and sufficient robust boundedness results for feedback systems
S Cyrus, L Lessard
IEEE Transactions on Automatic Control 68 (9), 5693-5698, 2022
12022
Stability of interconnected sector-bounded systems, with application to designing optimization algorithms
S Cyrus
The University of Wisconsin-Madison, 2021
12021
Locational effects of variability of injected power on total cost
S Cyrus, B Lesieutre
2015 IEEE Power and Energy Conference at Illinois (PECI), 1-5, 2015
12015
Net zero energy facilities with uncertainty handling
MJ Risbeck, C Zhang, S Cyrus, YM Lee
US Patent App. 18/398,007, 2024
2024
Monitoring and control system for connected building equipment with fault prediction and predictive maintenance
YM Lee, W Zhao, BE Keenan, SCK SAMY, MJ Risbeck, Z Jiang, C Zhang, ...
US Patent App. 18/116,974, 2024
2024
Building equipment control system with modular models
MJ Risbeck, C Zhang, Z Jiang, YM Lee, SCK Samy, J Amores, S Cyrus
US Patent App. 17/710,706, 2023
2023
A Revised Mehrotra Predictor-Corrector algorithm for Model Predictive Control
S Cyrus, AK Sedigh
arXiv preprint arXiv:1904.07459, 2019
2019
ME/ECE/CS 539
S Cyrus
2016
Locational Effects of Variability of Power Generation and Loads on Total Cost of Power Systems
S Cyrus
2015
The system can't perform the operation now. Try again later.
Articles 1–13