Follow
Robert C. LEACHMAN
Robert C. LEACHMAN
Professor of Industrial Engineering and Operations Research
Verified email at berkeley.edu - Homepage
Title
Cited by
Cited by
Year
A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
YF Hung, RC Leachman
IEEE Transactions on Semiconductor manufacturing 9 (2), 257-269, 1996
3151996
A general framework for modeling production
ST Hackman, RC Leachman
Management Science 35 (4), 478-495, 1989
2581989
An improved methodology for real-time production decisions at batch-process work stations
WW Weng, RC Leachman
IEEE transactions on semiconductor manufacturing 6 (3), 219-225, 1993
1551993
Benchmarking semiconductor manufacturing
RC Leachman, DA Hodges
IEEE transactions on semiconductor manufacturing 9 (2), 158-169, 1996
1511996
A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands
RC Leachman, A Gascon
Management Science 34 (3), 377-390, 1988
1451988
On capacity modeling for production planning with alternative machine types
RC Leachman, TF Carmon
IIE transactions 24 (4), 62-72, 1992
1431992
IMPReSS: An automated production-planning and delivery-quotation system at Harris Corporation—Semiconductor Sector
RC Leachman, RF Benson, C Liu, DJ Raar
Interfaces 26 (1), 6-37, 1996
1411996
Modeling train movements through complex rail networks
Q Lu, M Dessouky, RC Leachman
ACM Transactions on Modeling and Computer Simulation (TOMACS) 14 (1), 48-75, 2004
1362004
SLIM: Short cycle time and low inventory in manufacturing at Samsung Electronics
RC Leachman, J Kang, V Lin
Interfaces 32 (1), 61-77, 2002
1362002
Modeling techniques for automated production planning in the semiconductor industry
RC Leachman
Optimization in industry 1, 1, 1993
1121993
Port and modal allocation of waterborne containerized imports from Asia to the United States
RC Leachman
Transportation Research Part E: Logistics and Transportation Review 44 (2 …, 2008
1112008
Closed-loop measurement of equipment efficiency and equipment capacity
RC Leachman
IEEE Transactions on Semiconductor manufacturing 10 (1), 84-97, 1997
1001997
An exact solution procedure to determine the optimal dispatching times for complex rail networks
MM Dessouky, Q Lu, J Zhao, RC Leachman
IIE transactions 38 (2), 141-152, 2006
952006
A batch splitting method for a job shop scheduling problem in an MRP environment
HI Jeong, J Park, RC Leachman
International Journal of Production Research 37 (15), 3583-3598, 1999
861999
A simulation modeling methodology for analyzing large complex rail networks
MM Dessouky, RC Leachman
Simulation 65 (2), 131-142, 1995
861995
A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem
A Gascon, RC Leachman
Operations Research 36 (1), 50-56, 1988
841988
Resource-constrained scheduling of projects with variable-intensity activities
RC Leachman, A Dtncerler, S Kim
IIE transactions 22 (1), 31-40, 1990
811990
Reduced simulation models of wafer fabrication facilities
YF Hung, RC Leachman
International Journal of Production Research 37 (12), 2685-2701, 1999
791999
Economic efficiency analysis of wafer fabrication
RC Leachman, S Ding, CF Chien
IEEE Transactions on Automation Science and Engineering 4 (4), 501-512, 2007
762007
Globalization of semiconductors: Do real men have fabs, or virtual fabs?
RC Leachman, CH Leachman
Locating Global Advantage: Industry Dynamics in the International Economy …, 2004
622004
The system can't perform the operation now. Try again later.
Articles 1–20