Follow
Shuguang Zhan
Shuguang Zhan
Professor of Automotive and Transportation Engineering, Hefei University of Technology
Verified email at hfut.edu.cn - Homepage
Title
Cited by
Cited by
Year
Real-time high-speed train rescheduling in case of a complete blockage
S Zhan, LG Kroon, LP Veelenturf, JC Wagenaar
Transportation Research Part B: Methodological 78, 182-201, 2015
1842015
A rolling horizon approach to the high speed train rescheduling problem in case of a partial segment blockage
S Zhan, LG Kroon, J Zhao, Q Peng
Transportation Research Part E: Logistics and Transportation Review 95, 32-61, 2016
1032016
Integrated railway timetable rescheduling and dynamic passenger routing during a complete blockage
S Zhan, SC Wong, P Shang, Q Peng, J Xie, SM Lo
Transportation Research Part B: Methodological 143, 86-123, 2021
572021
Social equity-based timetabling and ticket pricing for high-speed railways
S Zhan, SC Wong, SM Lo
Transportation Research Part A: Policy and Practice 137, 165-186, 2020
472020
Energy-efficient high-speed train rescheduling during a major disruption
S Zhan, P Wang, SC Wong, SM Lo
Transportation Research Part E: Logistics and Transportation Review 157, 102492, 2022
262022
Two-stage robust railway line-planning approach with passenger demand uncertainty
S Pu, S Zhan
Transportation Research Part E: Logistics and Transportation Review 152, 102372, 2021
252021
Train schedule optimization based on schedule-based stochastic passenger assignment
J Xie, SC Wong, S Zhan, SM Lo, A Chen
Transportation Research Part E: Logistics and Transportation Review 136, 101882, 2020
252020
Train rescheduling in a major disruption on a high-speed railway network with seat reservation
S Zhan, SC Wong, P Shang, SM Lo
Transportmetrica A: Transport Science 18 (3), 532-567, 2022
142022
Multiscenario-based train headway analysis under virtual coupling system
J Pan, Q Peng, S Zhan, J Bai
Journal of Advanced Transportation 2021, 1-20, 2021
142021
A schedule-based timetable model for congested transit networks
J Xie, S Zhan, SC Wong, SM Lo
Transportation Research Part C: Emerging Technologies 124, 102925, 2021
142021
Real-time train rescheduling on high-speed railway under partial segment blockages
S Zhan, J Zhao, Q Peng
J China Railw Soc 38 (10), 1-13, 2016
142016
The economic value of reserve capacity considering the reliability and robustness of a rail transit network
J Liu, PM Schonfeld, S Zhan, B Du, M He, KCP Wang, Y Yin
Journal of Transportation Engineering, Part A: Systems 149 (6), 04023046, 2023
102023
Using energy consumption constraints to control the freight transportation structure in China (2021–2030)
D Zuo, Q Liang, S Zhan, W Huang, S Yang, M Wang
Energy 262, 125512, 2023
102023
Measuring and enhancing the connectivity reliability of a rail transit network
J Liu, PM Schonfeld, S Zhan, Q Peng, Y Liu
Transportmetrica A: Transport Science 18 (3), 1699-1733, 2022
102022
Veelenturf, and Joris C Wagenaar. 2015.“Real-time High-speed Train Rescheduling in Case of a Complete Blockage.”
S Zhan, LG Kroon, P Lucas
Transportation Research Part B: Methodological 78, 182-201, 0
8
Railway passenger flow recognition algorithm for terminal station based on cost theory and automatic frequency control
J Guo, Z Xie, Q Li, S Zhan, J Xu
IEEE Access 8, 26885-26892, 2020
72020
Reducing an urban rail transit network’s passenger-oriented vulnerability by adding turn-back tracks
J Liu, PM Schonfeld, S Zhan, KCP Wang, Q Peng
Transportmetrica B: Transport Dynamics 10 (1), 667-692, 2022
62022
Real-time train rescheduling on high-speed railway under complete segment blockages
S Zhan, J Zhao, Q Peng, P Xu, X Zhang
J. China Railw. Soc 37 (11), 1-9, 2015
62015
Empirical analysis of scaled mixed itinerary-size weibit model for itinerary choice in a schedule-based railway network
K Wen, J Xie, A Chen, SC Wong, S Zhan, SM Lo, L Qiang
Transportmetrica A: Transport Science 18 (3), 934-962, 2022
52022
A Schedule-Based Model for Passenger-Oriented Train Planning With Operating Cost and Capacity Constraints
J Xie, S Zhan, SC Wong, SM Lo
IEEE Transactions on Intelligent Transportation Systems 23 (11), 21314-21328, 2022
52022
The system can't perform the operation now. Try again later.
Articles 1–20