Follow
Micah Nehring
Micah Nehring
Lecturer in Mining Engineering, The University of Queensland
Verified email at uq.edu.au - Homepage
Title
Cited by
Cited by
Year
A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems
M Nehring, PF Knights, MS Kizil, E Hay
International journal of mining science and technology 28 (2), 205-214, 2018
812018
A new mathematical programming model for production schedule optimization in underground mining operations
M Nehring, E Topal, J Little
Journal of the Southern African Institute of Mining and Metallurgy 110 (8 …, 2010
702010
Integrated short-and medium-term underground mine production scheduling
M Nehring, E Topal, M Kizil, P Knights
Journal of the Southern African Institute of Mining and Metallurgy 112 (5 …, 2012
672012
Adjusted real option valuation to maximise mining project value–a case study using century mine
S Shafiee, E Topal, M Nehring
Project Evaluation Conference, 125-134, 2009
662009
Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming
M Nehring, E Topal, P Knights
Mining Technology 119 (4), 212-220, 2010
612010
A local branching heuristic for the open pit mine production scheduling problem
M Samavati, D Essam, M Nehring, R Sarker
European Journal of Operational Research 257 (1), 261-271, 2017
562017
Production schedule optimisation in underground hard rock mining using mixed integer programming
M Nehring, E Topal
Project evaluation conference, 169-175, 2007
542007
Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time
I Dzakpata, P Knights, MS Kizil, M Nehring, SM Aminossadati
502016
Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications
M Dean, P Knights, MS Kizil, M Nehring
AusIMM 2015 3rd International Future Mining Conference, Sydney, NSW …, 2015
502015
An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery
M Nehring, X Cheng
Journal of Cleaner Production 127, 228-239, 2016
482016
A new methodology for the open-pit mine production scheduling problem
M Samavati, D Essam, M Nehring, R Sarker
Omega 81, 169-182, 2018
442018
The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)
S Foroughi, JK Hamidi, M Monjezi, M Nehring
Resources Policy 63, 101408, 2019
392019
A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry
M Samavati, D Essam, M Nehring, R Sarker
International Journal of Production Economics 193, 12-20, 2017
392017
A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining
J Little, M Nehring, E Topal
Proceedings-Australian Mining Technology Conference, 2008
322008
Production scheduling optimisation for sublevel stoping mines using mathematical programming: A review of literature and future directions
F Sotoudeh, M Nehring, M Kizil, P Knights, A Mousavi
Resources Policy 68, 101809, 2020
302020
Operating value optimisation using simulation and mixed integer programming
A Salama, M Nehring, J Greberg
International Journal of Mining, Reclamation and Environment 28 (1), 25-46, 2014
292014
Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations
T Copland, M Nehring
Journal of the Southern African Institute of Mining and Metallurgy 116 (12 …, 2016
262016
Evaluation of the impact of commodity price change on mine plan of underground mining
A Salama, M Nehring, J Greberg
International Journal of Mining Science and Technology 25 (3), 375-382, 2015
262015
Integrated underground mining and pre-concentration systems; a critical review of technical concepts and developments
F Sotoudeh, M Nehring, M Kizil, P Knights
International Journal of Mining, Reclamation and Environment 35 (3), 153-182, 2021
222021
Production planning and scheduling in mining scenarios under IPCC mining systems
M Samavati, D Essam, M Nehring, R Sarker
Computers & Operations Research 115, 104714, 2020
222020
The system can't perform the operation now. Try again later.
Articles 1–20