A fuzzy AHP approach to personnel selection problem Z Güngör, G Serhadlıoğlu, SE Kesen Applied soft computing 9 (2), 641-646, 2009 | 538 | 2009 |
A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs) SE Kesen, SK Das, Z Güngör Computers & Operations Research 37 (6), 1148-1156, 2010 | 91 | 2010 |
Simulation of automated guided vehicle (AGV) systems based on just-in-time (JIT) philosophy in a job-shop environment SE Kesen, ÖF Baykoç Simulation Modelling Practice and Theory 15 (3), 272-284, 2007 | 76 | 2007 |
The coordinated production and transportation scheduling problem with a time-sensitive product: a branch-and-cut algorithm İ Karaoğlan, SE Kesen International Journal of Production Research 55 (2), 536-557, 2017 | 67 | 2017 |
Evaluating supply chain flexibility with order quantity constraints and lost sales SE Kesen, A Kanchanapiboon, SK Das International Journal of Production Economics 126 (2), 181-188, 2010 | 60 | 2010 |
Analyzing the behaviors of virtual cells (VCs) and traditional manufacturing systems: ant colony optimization (ACO)-based metamodels SE Kesen, MD Toksari, Z Güngör, E Güner Computers & Operations Research 36 (7), 2275-2285, 2009 | 53 | 2009 |
A memetic algorithm for joint production and distribution scheduling with due dates E Yağmur, SE Kesen Computers & Industrial Engineering 142, 106342, 2020 | 38 | 2020 |
New product design using FDMS and FANP under fuzzy environment Z Güngör, EK Delice, SE Kesen Applied Soft Computing 11 (4), 3347-3356, 2011 | 33 | 2011 |
Job scheduling in virtual manufacturing cells with lot-streaming strategy: a new mathematical model formulation and a genetic algorithm approach SE Kesen, Z Güngör Journal of the Operational Research Society 63, 683-695, 2012 | 28 | 2012 |
A mixed integer programming formulation for scheduling of virtual manufacturing cells (VMCs). SE Kesen, SK Das, Z Gungor International Journal of Advanced Manufacturing Technology 47, 2010 | 28 | 2010 |
Integrated production scheduling and distribution planning with time windows SE Kesen, T Bektaş Lean and Green Supply Chain Management: Optimization Models and Algorithms …, 2019 | 19 | 2019 |
Multi-trip heterogeneous vehicle routing problem coordinated with production scheduling: Memetic algorithm and simulated annealing approaches E Yağmur, SE Kesen Computers & Industrial Engineering 161, 107649, 2021 | 18 | 2021 |
How important is the batch splitting activity in scheduling of virtual manufacturing cells (VMCs)? SE Kesen, Z Güngör International Journal of Production Research 49 (6), 1645-1667, 2011 | 14 | 2011 |
Bi-objective coordinated production and transportation scheduling problem with sustainability: formulation and solution approaches E Yağmur, SE Kesen International Journal of Production Research 61 (3), 774-795, 2023 | 11 | 2023 |
A simulation analysis of a serial line pull system producing orders with various part types and volumes SE Kesen, M Sert International Journal of Modelling and Simulation 40 (3), 184-200, 2020 | 8 | 2020 |
Forward supply Chain network design problem: Heuristic approaches KOÇ Çağrı, E Özceylan, SE Kesen, ZA Çil, M Süleyman Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 24 (4), 749-763, 2018 | 8 | 2018 |
Adaptability of just-in-time (JIT) philosophy to service systems: a case study D Balci, SE Kesen, ÖF Baykoç Simulation 83 (9), 631-642, 2007 | 8 | 2007 |
Estimation of Turkey’s natural gas consumption by machine learning techniques OE Erdem, SE Kesen Gazi University Journal of Science 33 (1), 120-133, 2020 | 7 | 2020 |
Capacity-constrained supplier selection model with lost sales under stochastic demand behaviour SE Kesen Neural Computing and Applications 24, 347-356, 2014 | 7 | 2014 |
TAM ZAMANINDA ÜRETİM FELSEFİNE DAYALI BİR SERİ ÜRETİM HATTININ SİMÜLASYON TEKNİĞİYLE PERFORMANS ANALİZİ M Sert, SE Kesen Selçuk Üniversitesi Mühendislik Bilim ve Teknoloji Dergisi, 2019 | 6 | 2019 |